Xavier High School is currently evaluating its existing facilities and future expansion needs. As part of this process, BFJ was retained to analyze the existing zoning in terms of development potential and future development rights. The study involved a detailed calculation of existing floor areas for six separate buildings in order to obtain the total amount of zoning floor area. A review of the existing zoning regulations led to an estimation of excess development rights that can be utilized by the High School.